This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| sensors:start [2026/01/22 16:01] – bsamuel | sensors:start [2026/01/22 22:07] (current) – [5. Water / Water Energy Monitoring] bsamuel | ||
|---|---|---|---|
| Line 84: | Line 84: | ||
| * Energy data may inform event prioritization and anomaly detection | * Energy data may inform event prioritization and anomaly detection | ||
| - | ===== 5. Human Input / External Event Logging ===== | + | ==== Grid Power Monitoring & Predictive Use ==== |
| + | |||
| + | **Purpose: | ||
| + | |||
| + | **Required Measurements (if grid is available): | ||
| + | * Grid voltage, current, and frequency | ||
| + | * Short-term fluctuations and harmonics | ||
| + | * Availability signal (on/off) | ||
| + | |||
| + | **Optional Measurements: | ||
| + | * Historical grid availability patterns | ||
| + | * Probabilistic prediction of grid power for upcoming hours | ||
| + | |||
| + | **Integration & Control Logic:** | ||
| + | * AOFS must only allow grid power usage if parameters are within safe thresholds | ||
| + | * Automatic relays and actuators must cut off grid supply immediately on overvoltage, | ||
| + | * Predictive patterns can inform decisions, e.g., delaying high-load pump operations until grid is likely available | ||
| + | * All local safety thresholds remain authoritative and override probabilistic logic | ||
| + | |||
| + | ===== 5. Water / Water Energy Monitoring ===== | ||
| + | |||
| + | **Purpose: | ||
| + | |||
| + | **Required Measurements: | ||
| + | * Tank LOW and FULL levels | ||
| + | * Flow rate in main and zoned pipelines | ||
| + | * Flow rate and pressure of grid water supply (if available) | ||
| + | * Availability signal for grid water (on/off) | ||
| + | |||
| + | **Optional Measurements: | ||
| + | * Historical grid water supply patterns | ||
| + | * Probability of grid water availability in next hours or days | ||
| + | * Water quality indicators (salinity, turbidity) | ||
| + | |||
| + | **Integration & Control Logic:** | ||
| + | * AOFS may delay pumping from wells if probability of grid water availability is high | ||
| + | * Partial tank fill strategies: maintain mandatory minimum levels locally, avoid overfilling if grid water is likely | ||
| + | * Safety thresholds for tank levels must always be enforced, independent of probabilistic logic | ||
| + | * Logging of decisions, sensor readings, and probabilities is required for learning and optimization | ||
| + | |||
| + | ===== 6. Human Input / External Event Logging ===== | ||
| **Purpose: | **Purpose: | ||
| Line 102: | Line 142: | ||
| * Full audit trail for edits or deletions is required | * Full audit trail for edits or deletions is required | ||
| - | ===== 6. Optical / Camera Documentation Systems ===== | + | ===== 7. Optical / Camera Documentation Systems ===== |
| **Purpose: | **Purpose: | ||
| Line 123: | Line 163: | ||
| AI-based image analysis is **explicitly optional** and must not interfere with core logging or manual review. | AI-based image analysis is **explicitly optional** and must not interfere with core logging or manual review. | ||
| - | ===== 7. Data Logging & Synchronization Rules ===== | + | ===== 8. Data Logging & Synchronization Rules ===== |
| * All sensor readings and human-input events **must be logged locally** | * All sensor readings and human-input events **must be logged locally** | ||
| Line 133: | Line 173: | ||
| * Synchronization follows AOFS federation rules | * Synchronization follows AOFS federation rules | ||
| * Loss of connectivity must never result in data loss | * Loss of connectivity must never result in data loss | ||
| + | * Grid power and water predictive measurements and decisions must be logged, including: | ||
| + | - Probability estimates for predictive logic | ||
| + | - Decisions made (pump on/off, fill levels) | ||
| + | - Outcome of the decisions for future optimization | ||
| - | ===== 8. Calibration & Maintenance ===== | + | ===== 9. Calibration & Maintenance ===== |
| * All sensors must be calibrated according to manufacturer specifications | * All sensors must be calibrated according to manufacturer specifications | ||
| Line 143: | Line 187: | ||
| * Calibration and maintenance logs are auditable and synchronized | * Calibration and maintenance logs are auditable and synchronized | ||
| - | ===== 9. Compliance Requirements ===== | + | ===== 10. Compliance Requirements ===== |
| Minimum mandatory implementation: | Minimum mandatory implementation: | ||
| Line 155: | Line 199: | ||
| Optional sensors enhance optimization and research but **do not affect baseline compliance**. | Optional sensors enhance optimization and research but **do not affect baseline compliance**. | ||
| - | ===== 10. References ===== | + | ===== 11. References ===== |
| * [[architecture: | * [[architecture: | ||