Site Tools


electrical:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
electrical:start [2026/01/21 23:18] – [3. Optional Energy-Aware Operation] bsamuelelectrical:start [2026/01/22 15:22] (current) – [4. Implementation Guidelines] bsamuel
Line 78: Line 78:
  
  
-===== 4. Implementation Guidelines =====+===== 5. Implementation Guidelines =====
   * AOFS compliance does **not require any specific power source, monitoring, or energy-aware operation**.   * AOFS compliance does **not require any specific power source, monitoring, or energy-aware operation**.
   * Optional monitoring modules should follow AOFS **data logging and offline-first principles**.   * Optional monitoring modules should follow AOFS **data logging and offline-first principles**.
   * All controllers and modules, regardless of power source, **must enforce local fail-safes** for pumps, valves, and critical irrigation operations.   * All controllers and modules, regardless of power source, **must enforce local fail-safes** for pumps, valves, and critical irrigation operations.
  
electrical/start.1769037503.txt.gz · Last modified: by bsamuel