This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| electrical:start [2026/01/21 23:18] – [3. Optional Energy-Aware Operation] bsamuel | electrical:start [2026/01/22 15:22] (current) – [4. Implementation Guidelines] bsamuel | ||
|---|---|---|---|
| Line 78: | Line 78: | ||
| - | ===== 4. Implementation Guidelines ===== | + | ===== 5. Implementation Guidelines ===== |
| * AOFS compliance does **not require any specific power source, monitoring, or energy-aware operation**. | * AOFS compliance does **not require any specific power source, monitoring, or energy-aware operation**. | ||
| * Optional monitoring modules should follow AOFS **data logging and offline-first principles**. | * Optional monitoring modules should follow AOFS **data logging and offline-first principles**. | ||
| * All controllers and modules, regardless of power source, **must enforce local fail-safes** for pumps, valves, and critical irrigation operations. | * All controllers and modules, regardless of power source, **must enforce local fail-safes** for pumps, valves, and critical irrigation operations. | ||